TC's Bearhawk Pics and Progress - 2009    
Building stands and installing the wings.
   
Installing lift struts and fuel tanks  
Building the fuel sight gages  
Plumbing the fuel tanks  
Installing the flaps and ailerons on the wings.  

August / September - Getting the engine
Lycoming 0-540 from Bob Barrows.  

October / December - Wingtips and Rigging
Finish up the wingtips and rigging the flight controls.